£13.10
Supervision must enable and support employees to build effective professional relationships, develop good practice, and exercise both professional judgement and discretion in decision-making. For supervision to be effective it needs to combine a performance management approach with a dynamic, empowering and enabling supervisory relationship. Supervision should improve the quality of practice, support the development of integrated working and ensure continuing professional development.
More than a quarter of the accidents reported each year by NASC members to enforcing authorities are associated with manual handling – the transporting or supporting of loads by hand, or by bodily force. A well-established document that proved to still be robust and valid. This revised guidance focuses on the management of manual handling and includes the Health & Safety Executive (HSE) Manual handling assessment charts (MAC tool) – helps assess the risks posed by lifting, carrying and team manual handling activities. The MAC tool also assists the assessor to understand, interpret and categorise the level of risk of the various known risk factors associated with these activities. It also has a numerical and colour coding score system to highlight high-risk manual handling tasks. An example of Manual Handling Risk Assessment form is included. 16 pages.
This guidance outlines how employers should complete their risk assessments as required by the Management of Health and Safety at Work Regulations. As employers you must carry out an assessment to identify the hazards, evaluate the risks to employees and identify any control measures which should be implemented. 16 pages
Employers are responsible for establishing an inspection regime for the inspection of fall protection equipment that is produced and implemented by a competent person. A Register of equipment should be compiled for use in managing the inspection regime.
8 pages
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, email healthandsafety@nasc.org.uk . 61 pages. This guidance is available for pdf download only.
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
The aim of this guidance note is to give some practical guidance on how to comply with the Work at Height Regulations (WAHR) 2005 with regard to internal edge protection. 2 pages
The Health & Safety at Work Act 1974 requires that employers give all employees sufficient information, training & supervision as is necessary for their Health & Safety. A broad guidance reminding us to ensure good preparation and emphasising to employees the areas of responsibility we all have in working safely. 4 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Please enter a postcode to search for a member: